Regulation
Why T8 is being withdrawn: the Environment Agency and government position
The official reasons behind England's proposed T8 withdrawal: tyre-storage fire risks, breached exemption limits and waste crime, and what the move to permits means for operators.
By Tim Polidori
Published
The proposed withdrawal of the T8 waste exemption is not a ban on tyre recycling. It is a decision to move the mechanical treatment activities currently covered by T8 into environmental permitting. The government’s stated reasons are fire risks from tyre storage, evidence of significant breaches of exemption limits and the need to reduce criminal misuse. The Environment Agency is explaining how that policy would apply to operators in England.
This article draws on Defra’s supplementary government response to the waste-site consultation and the Environment Agency’s implementation guidance, checked on 8 November 2026. The published timetable remains subject to parliamentary approval: T8 has not already been withdrawn.
Who made the decision: Defra or the Environment Agency?
Defra is the government department responsible for the policy response. Its supplementary response sets out why the government concluded that T8 should be removed. The Environment Agency is the regulator in England: its T8 guidance explains the existing exemption, and its reform guidance tells operators how to prepare for the proposed change. Parliament must approve the regulations. These are related but distinct roles; the Environment Agency has not simply cancelled T8 on its own.
The official tyre-specific reason
Defra’s supplementary government response states: ‘Given the level of risk in relation to fire from the storage of tyres, and evidence that exemption limits are being exceeded by significant amounts, we have concluded that the T8 exemption cannot be retained.’
That passage identifies two specific concerns: the consequences of tyre storage fires and operations exceeding the limits intended to keep an exempt activity small and controlled. It does not mean that every T8 operator has breached the rules, or that every tyre-treatment site is involved in waste crime. Nor does the cited passage quantify the excess tonnage or identify individual incidents.
The response says removal is intended to improve environmental protection and public safety, increase compliance among operators entering the permitting regime and reduce criminal activity associated with misuse of T8. It also records that 78% of consultation respondents supported changing or removing the exemption. That figure describes responses to the consultation; it is not a measure of non-compliance across tyre businesses.
Why the wider exemption system is changing
The Environment Agency’s current reform guidance says the changes will better protect legitimate businesses, people, communities and the environment from harm caused by waste criminals and poorly managed waste operations. The wider government policy addresses abuse of exemptions that can harm communities and undermine businesses operating lawfully.
The broader package includes changes to limits and records, and restrictions where exemptions are technically connected to permitted activities. Those are system-wide reforms. The strongest tyre-specific justification remains the fire-risk and limit-exceedance evidence identified in the government response; it is important not to present every general reform concern as a separate finding about T8.
Why move to permits rather than keep T8?
An exemption only authorises a defined activity within its conditions. The government’s conclusion is that retaining T8 is not appropriate given the identified risks and misuse. The proposed replacement is the environmental permitting regime, rather than a prohibition on lawful recovery of tyre material.
A permit route requires the operator to establish that the site and activities are suitable for the applicable conditions. A standard rules permit is an option only where all relevant rules can be met; otherwise a bespoke permit may be needed. The appropriate route depends on the actual process, site, waste types, quantities and risks. Withdrawal does not guarantee that an existing T8 site will receive a permit, and a permit is not a substitute for sound management.
What is the EA asking operators to do?
The Agency advises operators to check their registrations, read the current conditions and keep accurate compliance records. Existing exemption conditions still matter during the proposed transition. An operator who cannot comply cannot use the reform timetable as permission to keep working outside those conditions.
- 6 January 2027: proposed commencement of the new regulations, subject to parliamentary approval.
- 6 April 2027: proposed T8 withdrawal after a three-month transition.
- Apply for the appropriate waste environmental permit before 6 April 2027 if continuing the affected activity. The published guidance says you can continue under your exemption while that application is processed.
- If you do not apply, stop the affected activity from the withdrawal date. Check the live guidance before relying on these dates or transitional arrangements.
Does this affect every garage or tyre fitter?
No. The supplementary government response distinguishes T8 mechanical treatment from businesses that produce and only store their own waste tyres before collection, such as tyre fitters and garages. It says those businesses are not affected by T8 removal because that storage is covered by non-waste framework directive exemptions. This does not remove their other waste responsibilities or authorise a separate collection, storage or processing business. Assess what the site actually does, rather than its trading description.
The current Environment Agency implementation guidance applies to England. Operators in Wales, Scotland or Northern Ireland must check their own regulator and must not assume the England timetable applies.
What should a responsible operator take from this?
- Check actual activity, waste codes, throughput and storage against the current authorisation.
- Prepare site plans, management procedures and evidence of environmental and fire-risk controls for a permit review.
- Allow time to discuss standard rules or bespoke eligibility with the Environment Agency or a competent adviser.
- Monitor the official guidance and approval status rather than assuming a proposed date is already law.
Where Scope 3 fits — and where it does not
For customers reporting disposal emissions, authorisation and traceability are useful checks on a waste supplier. But the official reasons for withdrawing T8 are environmental protection, public safety and tackling misuse, not a promise of net zero tyre disposal. A permit is not carbon certification. Emissions comparisons still need appropriate waste-mass data, treatment information, factors and reporting boundaries, separately from the legal permitting assessment.
This is an explanation of the published policy position, not an endorsement of every aspect of the reform or a site-specific legal opinion. The sources below let operators read the government’s rationale and the regulator’s current instructions directly.
Sources & further reading
- Defra — supplementary government response: T8 decision and reasons ↗
- Government policy — reforming the waste exemptions system ↗
- Environment Agency — proposed rules from January 2027 and transition ↗
- Environment Agency — current T8 tyre-treatment conditions ↗
- Environment Agency — waste environmental permits ↗
- GHG Protocol — Category 5 waste emissions guidance ↗